Skip to main content

2026 Water Season

We will be filling secondary water lines April 27-28, 2026.

Please note that the area east of the railroad tracks will not be fully pressurized until all repairs are made throughout the system.  This can take from one week to one month, depending on the severity of mainline breaks over the winter months.

PLEASE SHUT YOUR GATE VALVE BEFORE APRIL 27TH TO PREVENT ANY FLOODING WHILE THE SECONDARY WATER LINES ARE BEING FILLED.

Secondary water will be turned off October 1st or sooner if usage exceeds supply, which has been reduced by 20%.